Adventures in Brewing

Monday, September 24, 2012

Almost there

Wiring the control panel is done (besides the volt and amp meter)
After much headache all the plumbing and leak testing of the kettles is finished.
All to do is install the GFCi breaker and plug, wire the element plugs and mount the control panel.



No comments:

Post a Comment