Panel tags have arrive and been installed. Wiring is going well. At this point the only things we have yet to finish are the following:
1. Install top plate with heatsink
2. Run 6 Gauge power wiring to the heating element contactors (this includes the SSR connections)
3. Run wire from the temperature probe receptacles to the PID's
4. Run wire from the AC Shunt to the ammeter
5. Run 2 hots to the voltmeter
6. Final testing
Pics:
1. Install top plate with heatsink
2. Run 6 Gauge power wiring to the heating element contactors (this includes the SSR connections)
3. Run wire from the temperature probe receptacles to the PID's
4. Run wire from the AC Shunt to the ammeter
5. Run 2 hots to the voltmeter
6. Final testing
Pics:
A look at some of the wiring inside. Not everything is finished. Once the wiring is complete everything will be attached well with no loose wires hanging around. |
The bottom with all receptacles installed and tags installed as well |
Everything lit up. Volt/Amp meters have power but are not reading anything yet, same with PID's |
No comments:
Post a Comment