My kettles and cheapo stand have been moved into the basement. This is what we will use until we have the money to build a new stand and order the large 55 gallon kettles.
Almost everything is in place, just a couple modifications need to be made still. We switched the flow from starting on the left side and moving toward the right. It now flows from the right toward the left. This necessitates moving pumps and couple other small changes.
The vent hood has been fabricated and ducting purchased. It will be installed today or tomorrow and first full wet test, mock brew, and calibration will happen tomorrow.
Almost everything is in place, just a couple modifications need to be made still. We switched the flow from starting on the left side and moving toward the right. It now flows from the right toward the left. This necessitates moving pumps and couple other small changes.
The vent hood has been fabricated and ducting purchased. It will be installed today or tomorrow and first full wet test, mock brew, and calibration will happen tomorrow.
Hoses in this pic are stretched weird. Once the pumps are moved over it will look and operate better. |
A better view of the Control Panel. |